Phase 1 - DONE!
It’s been almost 1 year since we started work on our DIY Class B RV, actually about 10 months. We added a few final items to complete...
It’s been almost 1 year since we started work on our DIY Class B RV, actually about 10 months. We added a few final items to complete...
We now have a generator to run the roof A/C that is pretty much required here in Texas! Most of the time we will be on a shore line...
We have added both a Nova Kool R3800 12 VDC refrigerator and a galley sink! We are almost complete with the inside work for Phase 1 of...
Finally! Installed the upper cabinet doors. Actually installed all the cabinet doors, including the front of the kitchen gallery drawer!...
After reading this article from James at TheFitRV, I decided to move adding solar until later in the project and wire up a battery...
Installed the pillar post wall panels this weekend, completing most of the interior walls. I used 1/4 Revolution Plywood panels and...
A few items completed over the long Easter weekend... Upper wall panel on drivers side twin bed COMPLETED and INSTALLED! Complete with...
Completed cabinet construction and installation for the front passenger “tray table”! Not yet 100% complete, I need to add the outside...
Roller shade and wall panel added above the passenger side twin bed! Another picture with the reading lights on! We installed a floor...
After our initial trip, Chyrl wanted running boards added NEXT! And we added our “TRIPPER” labels on the rear side windows.
Canoes and our new RV, what’s not to like! Pulling our canoe trailer with my whitewater solo canoe and a few kayaks loaded.
In our Tripper! Here we are touring historic Fort Davis in West Texas! Chyrl with our traveling companion, Tripp! Yes, we named our RV...
Almost done with Phase 1 just in time for our initial “first trip” to test and shakedown what we have built to date. Custom made seat...
Cabinets stained, you can see the layout and structure supporting the twin beads. Galley has been removed to apply stain. Roof A/C...
Ceiling installed! A/C opening not cut out with the router yet. Ceiling panels are installed only between the upper cabinet where the...
Roof mounted A/C support frame in place, 2 layers of 3/4" foam insulation installed in the ceiling and inserted above the already...
Twin bed framing all complete! Notice we are leaving the inside half OPEN for storage. More flexible and if not packed with gear this...
Finally! The "Lower Side Panels" we ordered that were missing when we received our ProMaster arrived. And are installed! This was holding...
Building what I call "the stage" at the front behind the cab. So when the cab seats swivel back your feet are on the floor! Plans call to...
Put the first hole in our new ProMaster! This is where the "land line" connector for the 30A power connector is going to be installed....